|
Details
Client: The Aktiverum foundation
Café: 120 sqm. Instalationfloor phase 1: New floor slab aprox 170 sqm
Location: Frescati universityarea, Stockholm
|
 |
|
|
A development and feasibility design of the existing university sports facilities.
Ralph Erskine designed the sports hall at the university in 1982. A small café and terrace extension was completed in 2003. Additionally a detailed study and development plan for the universities sports facilities is being made. The rationalisation of ventilation system and inclusion of sustainable energy sources has lead to an opportunity to develop the buildings plan solution without detriment to its architectural qualities.
|